About a half hour out from Proctor leading L568 (Ranier to Proctor) with a mixed freight, BLE 906 looks good in the low winter light on a clear afternoon.
Southbound down the CN Rainy Sub about to cross through the diamond at Shelton Jct. these stacks and auto racks are gliding quietly along behind a SD75I and C44-9W power set.
BLE 906 and DMIR 409 pause and wait for clearance from the mine operations before they shove under the coarse crusher loadout and begin the process of loading.