SB Q211 glides down the KY Sub through Central Kentucky. Ex-SOO 756 (SD40).
A Loyall Mine Run is ready to depart the yard for loading at Sarah in Bell county on the CV Subdivision.
NB on the KY Sub just north of Livingston, another massive combo train for Hazard crosses Roundstone Creek trailing 191 mty hoppers.
It's another hot and humid summer day as loads out of Weller snake along the bluff and into Williamson on the NS Pokey Division.
During a spring shower, a mine shifter out of Martin prepares to flood load at the Bate Branch mine on the E&BV Subdivision.
EB down the Pokey with 135 mtys and one EMD on a hot summer's morning.
EB mtys crossover to single track at WD Cabin on the Big Sandy Subdivision.
Mty tubs emerge from the shadows as they swing around the curve at Louisa on the Big Sandy Subdivision on the way to Coal Run Yard.
A EMD lease unit works a cut of NS hoppers at the big Ohio River barge transloader in Kenova. EMDX 6048: Serial #73676-9...Built 12-73...SD40-2...ex-ICG 6048...nee-Rock Island 4798
A SB CSX coal train out of Loyall takes a shortcut south on the NS to Frisco.
SB Q541 heads straight into the setting sun at Rockholds on the KD Subdivision.
A Lynch mine run swings off the Poor Fork Branch and starts the climb up into the Lynch Complex.
A mine run for the Pevler Complex snakes past a slide fence deep in the valley along Wolf Creek.
EB mtys out of Russell swing off the Big Sandy main and onto the E&BV at Beaver Junction.
SB coal loads cross Roundstone Creek on their trip down the KY Sub to Corbin.