RC-2 leaving the railway’s Upper Yard. The crew pulled a hopper from storage at the Upper Yard. The train also includes empties pulled from Certainteed located on the Northfield Industrial Track... (more)
"BABYLON-HICKSVILLE SHUTTLE ON THE CENTRAL BRANCH" DM30AC 506 eight bilevels then DM30AC 509 up front thru the Wellwood Avenue RR Crossing and C331 PL signal. Urban Avenue RR Crossing el... (more)