With an earlier start time from Ronkonkoma the Greenport Scoot is seen in better light. The scoot has just crossed the Mill Road RR crossing as it approaches MP 69 on the LIRR Mainline.
The crew is reassembling the train for pull-pull operational at MP 59. The trip to Riverhead for the Paraco switch will be a quick one. No waiting for the Greenport Scoot at LD Block-Limit.
Another summer of Amtrak running to New York’s Grand Central Terminal. This summer major work on the empire connection and the Spuyten Duyvil Bridge. Train 239 bound for Albany Rensselaer is slo... (more)
Switching the small yard at Pine Aire. Conductor Tom Caliendo on the ground directing engineer Don Carman. The crew will head east of Ronkonkoma to switch Brookhaven Rail Terminal.
"CHRISTMAS BLIZZARD OF 2010. MASS TRANSIT SHUT DOWN" Christmas blizzard of 2010 brought mass transit to its knees in New York. At the time of the photo the LIRR was still shut down. Cover photo fo... (more)