On August 10, a northbound freight train derailed in the 57-kilometer-long Gotthard Base Tunnel, and since then both tubes have been closed. All passenger traffic, as well as freight traffic that ... (more)
On August 10, a northbound freight train derailed in the 57-kilometer-long Gotthard Base Tunnel, and since then both tubes have been closed. All passenger traffic, as well as freight traffic that ... (more)
In January 2024, the Gotthard Base Tunnel (GBT) will only be open to traffic for a few weeks with significant restrictions. The railway undertakings (RUs) must therefore ensure that their drivers ... (more)
The "Erlebniszug San Gottardo" from SBB Historic runs regularly between Erstfeld and Bodio on the Gotthard mountain route during the summer half-year. It is always hauled by the Ae 6/6 #... (more)
Re 460 # 010 of the SBB is leaving the Wattinger loop tunnel and crossing the Reuss river on the lower Wattinger bridge, on the Gotthard north ramp between Wassen and Gurtnellen. The locomotive is... (more)