A trio of LVRB EMD switchers head east through the River Yard after dropping a cut of interchange cars for Norfolk Southern. The crew will now pick up the consist of the inbound NS 262 RoadRailer... (more)
Switchers and Stacks: An LVRB job powered by an SW1500 and two MP15DCs drags a lengthy cut of intermodal cars to the Norfolk Southern interchange adjacent to the Lehigh Line. These cars we... (more)
A very odd consist for 2013 made up of an MP15DC-SW7-MP15DC sandwich pull their double stack train to a stop as another employee hands off orders on the ground to the engineer.
While NS 20K goes about dropping off a set of cars into the River Yard, the PBNE 19 leads two other switchers as it brings a cut of double stacks through the car filled yard and past the famous Be... (more)
LVRB is able to assemble a locomotive consist not seen often in 2013. An MP15DC-SW7-MP15DC consist drops a small amount of interchange traffic for NS (2 cars) and CP (3 cars) in the River Yard at... (more)