MMA 5017 South idles on the main awaiting a relief crew from Farnham
MMA 5017 South crosses the Richelieu River on a cold day.
B23-7 trying to makes its way to the KI sub to go to Brownville Junction to pick up VB 103 to plow the Moosehead sub.
MMA 3000 East crosses the second trestle in Eastman.
MMA 5021 West works upgrade towards Foster
Near sunset as MMA 3000 East goes through Eastman
Ex CP plow being pushed by B23-7 2004 by the East outlet of Moosehead Lake and approximately 77 miles from its destination Lac Megantic Quebec.
Ex BAR Rail crane X127 is putting a rebuilt Amtrak engine into Amtrak 273 for testing as part of the Poland Project.
Headed for the Blacksmith shop MMA 273 is having the Amtrak rebuilt engine being hooked up for testing before being sent to Poland.
MMA 2004 coming into Brownville Junction to pick up its plow to head west on the Moosehead Sub
Plow extra lead by VB 103 ex CP plow and pushed by MMA 2004 heading for Lac Megantic Quebec after a snow storm dumping 12-15 inches of snow.
Cold, windy, snowsqualls you name it, as MMA 5018 South embarks on its voyage towards Maine
With steam rising from the river in the background, the first # 810 of the year has just entered CP territory on its way to the CN interchange in sub zero temperature
Leaving Farnham, the St-Rosalie Turn crosses the Yamaska River in sub-zero temperature
Another aspect of railroad operations in the winter. MOW crew using an air compressor in order to clean up the switches