After bringing the loads down the hill the crew runs around to begin preparations to shove them out onto the dock for unloading. This trio of B&LE units has caused quite the stir this spring in n... (more)
Guess the photogs in the scene below! If this spot catches on, I will be able to say that I was the first person to get a shot from this location. Medlin's Hill has a nice ring to it! Ha ha
Well what have we here? Some Lake Superior Railroad Museum pieces wait to be picked up by the BNSF for transfer to the North Shore Scenic Railroad after winter storage at CN facilities in Proctor ... (more)
The afternoon Proctor Road Switch job brings limestone loads up the ramp from Missabe Jct. and will soon tackle Proctor Hill in route to Proctor yard. That's quite the pile of taconite pellets on... (more)
After bringing loads down Proctor Hill, the trio of B&LE units have run around the train and the crew begins preparations to shove the loads out onto the dock. The engineer walks to the head end ... (more)