SOR 4200 works the yard, while VIA 97 the Maple Leaf rounds the bay.
A three pack of GP9's pulls down the Aldershot yard lead as light power while the hogger waves.
VIA 82 pulls through Bayview to overtake VIA 90 at Snake, next stop Toronto Union Station!
OVR 4200 works Stuart Street Yard, while RLK 3873 idles in the background and some dimensional loads sit at the east end of the yard.
GO 490 rolls through Bayview on the advertised at 0715.
The engineer on CN 422 exchanges waves with the engineer on OVR 4200 working the Hamilton Yard.
3 trucks east on the 403, verus the 2 EMD's and train east on the Oakville subdivision.
CN 384 notches up hard through Snake after meeting VIA 71 and CN 399 which can be seen on track one.
671 struggles up the grade at the Continental Divide.
CP crews prepare 5766 west's plow train near the Alberta/BC border.
One of CP's newest additions to the roster idles at the depot at Banff.
Thankfully it was March, and the snow was only waist deep at Lake Louise!
Perfect morning in the Rocky Mountains as the DPU on Sulfur loads takes the curve made famous by Nicholas Morant.
GO 564 holds down the east end of the 2816 excursion train at Milton Ontario.
426 rolls through the S curve at Hamilton West, enroute to Hamilton.