#15 simmers next to the water column and coal dock. The water column was brought back into service this year and the FEBT has started to restore the coal dock.
The steel bridge at Gulch was finished in the winter of 1901 and was at the time the highest steel cantilever structure in the world. It served faithfully until 1969 when the new 18A bridge and tu... (more)
Our charter train has just left the Carcross station. It is crossing the wooden swing bridge over the narrow neck of water between the lakes Bennett and Nares. The swing bridge was designed to rot... (more)