Snow clearance on the Furka pass line of the Dampfbahn Furka Bergstrecke (DFB) (Furka steam railway) . The Steffenbach bridge, which is folded down during the winter to give the avalanches a free ... (more)
Snow clearance on the Furka pass line of the Dampfbahn Furka Bergstrecke (DFB), on about 1700 meter a.s.l., in the Furkareuss gorge. The crew is working between the tunnels Alt Senntumstaffel III ... (more)
Snow clearance on the Furka pass line of the Dampfbahn Furka Bergstrecke (DFB). The crew is returning from the lunch brake in Realp to the work place between Alt Sennstumstaffel III and II tunnels... (more)
The cogwheel diesellocomotive HGm 2/2 # 51 of the Dampfbahn Furka Bergstrecke brought a group of spectators from Realp up to the Steffenbach bridge this day. This unique bridge, constructed in 192... (more)
The line over the Furka pass will be closed for the next 7 months, the Steffenbach bridge in the background was lowered/pulled back to the abutments to give the avalanches free path during the win... (more)