SP 1 had arrived back at Owenyo on a standard gauge flatcar from the San Joaquin division shops at Bakersfield following an overhaul and what looks like a fresh paint job. SP 9, shown here helping... (more)
Built in November 1993 as the 3rd unit in an order of 35 Dash 9's for the CNW, this is the 1st trip west to the Powder River on a Havanna, IL, to Antelope Mine, WY, coal empty. The power is in the... (more)
First of a new model on the BNSF, the dynamic-brake equipped 3GS21B-DE, brand new 1294 is shown awaiting the BNSF local in Paducah and Louisville's North Yard. These units are waybilled to Los A... (more)